CONSTRUCTION PROGRESS UPDATES : A HOUSE FOR MANUEL FROM WORLD SMILE PROJECT - OCTOBER 20, 2021

in STEEM FOR BETTERLIFE2 years ago

SmartSelect_20211021-205749_Gallery.jpg


The work that is classified as the main work has been carried out perfectly in the past three days, the plastering or plastering of the brick walls for Manuel's house has now reached 98% where only 3 meters of area must be perfected in the front trestle area. Meanwhile, one other main job, namely the manufacture of doors and windows, was almost completed by workers in separate places.

Especially for door work using steel plates while for windows waiting for installation later after the plaster or plaster has dried completely. The next steps taken were perfecting the rest of the plastering of the screen spears, installing doors and windows, installing electrical installations and painting the outer walls of the building.

Of all the work that has been done and is being carried out by the Venezuelan team, I have observed in the form of videos and photos that were sent some time ago that the progress of the construction of a house for Manuel has increased 5% to 90% at this time. This is a significant increase during 3 working days.

For clarity, I will present several documents in the form of photos sent by the World Smile Project team in Venezuela as below:

CONSTRUCTION PROGRESS UPDATES
PerspectivePresent Condiition
Front ViewIMG_20211021_203703_623.jpg
Front and Right ViewIMG_20211021_203658_574.jpg
Right ViewIMG_20211021_203655_194.jpg
Back and Right ViewIMG_20211021_203649_904.jpg
Back and Left ViewIMG_20211021_203639_078.jpg
Back ViewIMG_20211021_203644_731.jpg
MAIN INFORMATION FROM WORLD SMILE PROJECT
Project NameHousing Project
BeneficiaryManuel and Family
AddressVenezuela

Important notes in this development are as follows:

  • I will always publish the progress of every progress according to the pictures or videos sent by the Venezuelan team
  • Financial Update will be done by @mariana4ve
  • I will analyze the progress of this construction progress before I publish it and according to technical regulations.
  • Documents in the form of images or videos belong to the Venezuelan team entrusted to me to publish.
  • Update construction at least once a week

This is a technical analysis report regarding the construction progress of the construction of a house for Manuel in Venezuela.


Previous progress post link


Cc : @steemcurator01 @steemcurator02 @pennsif @el-nailul @mariana4ve

Thanks
@klen.civil


cropped_image (1).png

Sort:  
 2 years ago 

Wah senang melihat rumahnya hampir selesai.😇

 2 years ago 

Ya tentunya akan segera bisa di tempati

 2 years ago 

Rumoh aeak Venezuela yang di danai dari program World Smile Project kak

Kemajuan yang luar biasa semoga tepat dengan waktu dalam pembangunan rumah di vanezuela
#club5050
#worldsmileproject50pc

 2 years ago 

Thanks

 2 years ago 

Mantap bang @klen-civil

 2 years ago 

terima kasih

 2 years ago 

Sama2 bang

 2 years ago 

😇

 2 years ago 

Kenapa pusing bang...🤭

 2 years ago 

Bang @moer mana...kok diam kali

 2 years ago 

Bang moer sedang pusing dengan postingan yang tiada hasil 🤭

 2 years ago 

Semangat bang moer

 2 years ago 

Badai pasti berlalu 😂

 2 years ago 

🤭🤭😀😀🏊

 2 years ago 

Nyan pat kana @moer
hahaha

 2 years ago 

Hahaha

 2 years ago 

Wowww excelente reporte, ya lo que falta es muy poco, ya pronto veremos terminada la casa de Manuel y su familia, que alegría vale.

 2 years ago 

Of course thanks to the hard work of the World Smile Project team in Venezuela

 2 years ago 

Si es muy bueno el equipo, hay mucho entusiasmo de trabajar.

 2 years ago 

отличная работа, друг!

Coin Marketplace

STEEM 0.25
TRX 0.11
JST 0.032
BTC 61618.64
ETH 3009.45
USDT 1.00
SBD 3.78