In general terms and technical analysis, the construction of a house for Manuel has reached 85% which is a very significant achievement in the past few days. The rest of the work that is being and will continue to be done at this time is plastering the walls of the house, then installing doors and windows which only takes about 2 working days at most. And this work will also be carried out after the plastering of the walls is being done at this time.

For work at the final stage, the workers only do the installation of electrical installations and wall painting as well as the final finishing of the work that is classified as refinement. Therefore, the rest of the work that is not yet 100% perfect, which is only four items, from here based on a construction engineering analysis I conclude that a house for Manuel in Venezuela has progressed at 85%.

For clarity, I will present several documents in the form of photos sent by the World Smile Project team in Venezuela as below:

CONSTRUCTION PROGRESS UPDATES
PerspectivePresent Condiition
Front Viewimage.png
Front and Right Viewimage.png
Front and Left Viewimage.png
Back and Right Viewimage.png
Back and Left Viewimage.png
Back Viewimage.png
MAIN INFORMATION FROM WORLD SMILE PROJECT
Project NameHousing Project
BeneficiaryManuel and Family
AddressVenezuela

Important notes in this development are as follows:

  • I will always publish the progress of every progress according to the pictures or videos sent by the Venezuelan team
  • Financial Update will be done by @mariana4ve
  • I will analyze the progress of this construction progress before I publish it and according to technical regulations.
  • Documents in the form of images or videos belong to the Venezuelan team entrusted to me to publish.
  • Update construction at least once a week

This is a technical analysis report regarding the construction progress of the construction of a house for Manuel in Venezuela.


Previous progress post link


Cc : @steemcurator01 @steemcurator02 @pennsif @el-nailul @mariana4ve

Thanks
@klen.civil


cropped_image (1).png

Sort:  
 3 years ago 

Great, the construction of Manuel's House is almost complete. Only 15% left. Next week will probably be finished. Good Job.

 3 years ago 

I think it will be resolved soon

 3 years ago 

Me encanta el progreso de este proyecto tan maravilloso.

 3 years ago 

Of course thanks to the hard work of the Venezuelan team, thank you

 3 years ago 

Gracias a ti.

 3 years ago 

Ur welcome

 3 years ago 

Semoga segera bisa di tempati

 3 years ago 

Aamiin

 3 years ago 

With #club5050 going on without us realizing the process of developing an account is very fast. Thank you for supporting #club5050.

regards @akmal1

 3 years ago 

Thanks a lot

#club5050

 3 years ago 

Wellcome bro

 3 years ago 

😅

 3 years ago 

Mampu... Nyan payah takheun

 3 years ago 

Tanyoe mantong minnow
😁

Great build, beautiful house 😍

 3 years ago 

Thanks

Luar biasa pembangunan tersebut hampir semua selesai.

#club5050
#worldsmileproject50pc

Coin Marketplace

STEEM 0.29
TRX 0.12
JST 0.033
BTC 63700.12
ETH 3136.09
USDT 1.00
SBD 3.83