Drilling an oil well goes beyond simply drilling a hole that connects the subsurface to the surface to extract oil. In the drilling and construction of an oil well it is necessary to apply engineering techniques and mathematical calculations in the various processes carried out.

We can start by involving the most suitable techniques where petroleum engineering is essential with the different processes necessary to drill the hole, lower the casing, comment the space between casing and the walls of the well, run well profiles, lower and set the well completion equipment.

In the drilling of the hole the first thing to consider from an engineering point of view is the fact that the design of the hydraulics is in accordance with the operational conditions.

In the design of hydraulics is taken into account the diameter of the well to be drilled, the physical properties of the mud are very important because it depends on them the optimal speed that should have the drilling fluid when it comes out of the jets of the drill bit, the conclusion of the case in this process indicates that a pre-start test gives us an indication that the design of hydraulics is in accordance with the operational conditions both underground and at the surface.

In the drilling of the well, drilling indicators such as drilling speed (ROP) measured in ft / hour should be monitored by the driller, and where there is an abrupt change in what means an increase should be notified to the operations engineer to take the precautions of well control and perform the relevant calculations for the density of the new drilling fluid control.

References

Drilling Software

Casing Pipe

How Oil Drilling Works

Sort:  

Upvoted! Thank you for supporting witness @jswit.

Coin Marketplace

STEEM 0.26
TRX 0.12
JST 0.031
BTC 56792.82
ETH 2874.63
USDT 1.00
SBD 3.67