The World Smile Project | Current Conditions for Construction of the Water System and Public Latrine
The Construction of the Water System and Public Latrine built by the World Smile Project program has lasted for 11 days or on January 11, 2021 to be precise and as of today January 22, 2021, the Construction of the Water System and Public Latrine has made significant progress. Details of the progress report can be seen directly at the post link. WSP : Construction Progress Report from Water System and Public Latrine [January 22, 2022]
We as the World Smile Project Team will continue to accompany and report on every stage of the implementation process of Water System and Public Latrine Development so that steemians and donors who have supported the development can see it directly, as well as all programs carried out by the World Smile Project. maintain management transparency.
We hope that the Construction of the Water System and Public Latrine system will run smoothly according to the time schedule that has been set together, in order to speed up the functioning of the clean water system for local residents. become a strategic step for a steem promo event among the wider community, and can invite other donors for the next project.
The types of work that exist in the Construction of the Water System and Public Latrine can be seen in the following table, all information that we will display refers to the design drawings and BoQ that have been determined by the World Smile Project Team by adjusting the realization process in the field and applicable technical analysis. in Indonesia.
Number | Type of work | Notes |
---|---|---|
1. | Bouwplank | Complete |
2. | Foundation Excavation | Complete |
3. | Footing | Complete |
4. | Sloof | Complete |
5. | Column | On Progress |
6. | Beam | On Progress |
7. | Wall | On Progress |
8. | Water tub | On Progress |
9. | Roof | On Progress |
10. | Painting | On Progress |
11. | Electrical | On Progress |
12. | etc | On Progress |
Project Name | Water System and Public Latrin |
---|---|
Beneficiary | Kumbang Village Community |
Address | Syamtalira Aron, North Aceh - Indonesia |
Map | what3words.com |
Note:
- Construction progress reports are in accordance with technical analysis
- Financial Report will be submitted by other WSP team
- All documents have been authorized by the relevant parties
- Documents in the form of photos or writing must have permission from World Smile Project team
Cc : @steemcurator01 @pennsif @el-nailul @heriadi @irawandedy @miftahuddin @kle.civil @mariana4ve @adollaraday
right now work is ongoing...this is great work....keep it up and go ahead we are all with steem for betterlife.
stay connected stay safe.
thanks bro,
89.4% уникальности текста (uniqueness of the text)
Здравствуйте. Это полуавтоматическая проверка уникальности сервисом content-watch. Пожалуйста, сообщайте о неточностях. Уникальность вашей статьи согласно сервиса content-watch.ru равна: 89.4%
Hello. This is a half-automatic uniqueness check by the content-watch service Please report any inaccuracies The uniqueness of your stat th according to the content-watch.ru service is equal to: 89.4%
LoL