#CLUB100 | My Activity Today, Supervising Road Repair Work Using The Patching Method

in STEEM FOR BETTERLIFE2 years ago

IMG_20220528_132906.jpg
Patching Work Process using Excavator Heavy Equipment

Patching work is a repair method carried out by workers to repair the damage found on the road body, especially on the pavement layer with asphalt covering that has been damaged such as large holes, waves and distortions that can cause accidents on the highway.

As a supervisory team on the Paya Bakong sub-district road repair work project, I must always be on site to continue to control all stages of the work that is being carried out during the implementation period of the work.

IMG_20220525_114258.jpg
Other parts of the road surface that are repaired

The process or stages of implementation that are being carried out are, starting with cutting or patching the damaged asphalt surface using heavy excavators with depths ranging from about 20 cm or depending on the level of damage that occurs.

After the patching is complete, it is then backfilled using class B pavement material using heavy motor graders and then compacted again using a Compact or Vibro Roller and then watered using a water tank and then compacted again to bind the installed pavement layer material.

IMG_20220525_145550.jpg
The patched part is backfilled with Class B Pavement Layer material and then compacted
IMG_20220525_114529.jpg

Patching work requires a long time and accuracy so that the handling at the point of damage does not occur again, therefore it is necessary to have special experts to supervise the implementation of the work.

This patching work has been going on for 3 days and the initial handling or repair has been carried out for 1.5 KM, while the total length of the road that must be repaired is 5.5 KM, it takes about one more week for new patching work then proceed to stage 2, namely the work Class A Pavement Layer, up to asphalt work.

IMG_20220526_111510.jpg

IMG_20220525_110115.jpg

IMG_20220525_105640.jpg

IMG_20220525_104018.jpg

IMG_20220528_135135.jpg

IMG_20220528_132806.jpg

Those are some of my activities at the job site when supervising road repair work using the Patching method, hopefully it will be useful.

Cc : @pennsif

Best Regard

ABOUT ME

No friendship is good, except for a conversation that never ends

Sort:  
 2 years ago 

Lon Pike buno di matang munje ka seunang teuh hare

 2 years ago 

Lewat matang munye bacut

Your post has been successfully curated by our team via @fredquantum at 50%. Thank you for your committed efforts, we invite you to do more and keep posting high quality posts for a chance to win valuable upvotes from our team of curators and probable selection for an additional upvote later this week in the Top Seven.

received_388032689541375-1.jpeg

Note: You must enter the tag #fintech among the first 4 tags for your post to be reviewed.

 2 years ago 

thanks bro

Coin Marketplace

STEEM 0.17
TRX 0.13
JST 0.028
BTC 56576.23
ETH 3024.80
USDT 1.00
SBD 2.29