WSP : Construction Progress Report from Water System and Public Latrine [January 25, 2022]

in STEEM FOR BETTERLIFE2 years ago (edited)
Note: 50% of Rewards to accelerate the construction of the Water System and Public Latrine @worldsmile account

image.png

Construction Progress Report from Water System and Public Latrine

Today is January 25, 2022, the construction work of the Water System and Public Latrine has made significant physical progress over the past few days. Where the 4 main work on this construction has been completed by the workers, namely the installation of bouwplank, footing or foundation, sloof and columns. While the other 2 main works being carried out are the walls and water tub which are targeted to be completed in the next two days, but will continue with the installation of ceramics on the walls and water tub after the floor work is half done or after being filled and rough casting is done.

This floor work will be carried out concurrently with the installation of the upper beams of the building prior to the installation of the roof which will use a light steel frame. At this time the progress that has been owned by the construction after technical analysis is 32% of the total. For more details of this construction, see the main work table and photo table of the current condition of the whole.

Table of the main types of work from the construction of the Water System and Public Latriner
NumberType of workNotes
1.BouwplankComplete
2.FootingComplete
3.SloofComplete
4.ColumnComplete
5.WallAlmost complete
6.BeamOn Progres
7.FloorOn Progress
8.Water tubAlmost complete
9.RoofOn Progress
10.PaintingOn Progress
11.ElectricalOn Progress
Design of Water System and Public Latrine Construction
image.png
Progress of Water System and Public Latrine Construction
PerspectivePresent Condiition
Front Viewimage.png
Front and Right Viewimage.png
Front and Left Viewimage.png
Back Viewimage.png
Right Viewimage.png
Left Viewimage.png
Back and Right Viewimage.png
Back and Left Viewimage.png

This is a construction report related to the construction of the Water System and Public Latrine to all donors of the World Smile Project, especially to the steemit team through @steemcurator01 and @steemcurator02 who have provided support so far, I have done this construction report in accordance with technical analysis prevailing in Indonesia.

MAIN INFORMATION FROM WORLD SMILE PROJECT
Project NameWater System and Public Latrin
BeneficiaryKumbang Village Community
AddressSyamtalira Aron, North Aceh - Indonesia
Mapwhat3words.com

Related Links


Note:


  • Construction progress reports are in accordance with technical analysis
  • Financial Report will be submitted by other WSP team
  • All documents have been authorized by the relevant parties
  • Documents in the form of photos or writing must have permission from World Smile Project team

Cc : @pennsif @el-nailul @heriadi @irawandedy @miftahuddin @sofian88 @mariana4ve

Thanks
@klen.civil


cropped_image (1).png

Sort:  
 2 years ago 

You are doing very well my friend in act of kindness

 2 years ago 

Buen trabajo equipo, van super rápido.

 2 years ago 

The target no later than mid-February must be ready
😉

 2 years ago 

Wow, this is a great project, keep it up @klen.civil, but please how do I get labelled as a member of this awesome community @steembetterlife

 2 years ago 

Thanks

 2 years ago 

Wow this is a wonderful project that will definitely serve humanity. Thanks for sharing the progress with us here

 2 years ago 

Thanks

 2 years ago 

wow! It is almost done sir. I am so excited to see the finished product

 2 years ago 

Thanks

 2 years ago 

Sir, there is no good response on any post from your community.

 2 years ago 

Thanks

Coin Marketplace

STEEM 0.20
TRX 0.13
JST 0.029
BTC 61428.91
ETH 3382.72
USDT 1.00
SBD 2.50