CITYSCAPE PHOTOGRAPHY AND ART CONTEST WEEK #088 - Cable-stayed bridge
Cable-stayed bridge over the railroad tracks was built in 1997. The length of the cable-stayed bridge is 516 m, the height of the pylons is 54 m
Transport overpass: (start of construction in 1996, finish -2009), total length 6.4 km, width - 11.5 - 14.8 m
This port overpass made it possible to deliver goods faster and save time on their transshipment. There is no traffic jam on the street when entering the port because of the long container trucks.
![P7038112-2.jpg](https://steemitimages.com/640x0/https://cdn.steemitimages.com/DQmSfDV5iMzo6Y7tgA2BJgyXsLHJ5bAHyQKaZBBQ7NNduow/P7038112-2.jpg)
Captured in manual mode
Camera: OLYMPUS E-M1
Lens: M.Zuiko Digital ED 12-40mm 1:2.8 PRO
Software: Olympus Workspace
Software: Lightroom
Enjoy!
Original photos by @leylar
Beautiful photography, nicely chosen the time of the day for shooting, like the reflection of sky in water.
You post is nominated for „@art-venture“ Support Program, @booming account upvote. Only the posts that are not cross posted, original and posted from Xpilar community page and using tag #art-venturehave priority. If your post gets approval, then you get upvote within few days. Good luck!
Thank you for your kind words and support