Sort:  

I have a GTT Mirage and Delta Elite ;)

Delta on the Lathe.

There was about a 4 month wait time on my Mirage and there as no wait on the Delta as it happened to be ready as I called GTT.

http://www.glasstorchtech.com/

Coin Marketplace

STEEM 0.20
TRX 0.14
JST 0.030
BTC 67275.57
ETH 3480.50
USDT 1.00
SBD 2.67