( Life)Drawing of steel frame mounters,,:

in #worker7 years ago

Hello stemanian everything, this is a new work i got last week, alhamdulillah stemanian everything

image

Building area of ​​26m building tile pile10m

image

Length 60m, width26m. Overall building 1560 m

image

How to install first, start from water lebe, then install mornya one by one with caution. Then abil iron aibim pole with heavy equipment one by one, then install it carefully.

image

image

image

image

image

Follow and upvoted@musliadi

Coin Marketplace

STEEM 0.16
TRX 0.15
JST 0.028
BTC 59698.94
ETH 2303.28
USDT 1.00
SBD 2.51