Like you guys can see on the photograph we started with a primer on the walls that will be covered by soil after we filled holes and inperfections on the surface.
20160801_141425.jpg

20160802_153109.jpg
The product that we use to seal the walls is a 4mm torch on system that is applied by torch fusion( PG gas with a flame gun attached ) the Lapjoints has been heat-sealed with a100mm overlap.

The reason why we seal the walls(that is covered by soil) that way is to stop the moisture from penatrating the walls.
and causing dampness in the inside walls.

Thank you for reading my post and i will give an update when its on the next stage of the project
Remember always to smile :)
steemit_follow_me_v1.gif

Sort:  

Oh is that how it's done. looks like you they to call for waterproofing lol.
Interesting line of work mate I like to see more :) Best of luck

Thank you @cryptodecript I'm glad you liked my post

Very interesting I may say cant wait to see more

Wow that's cool