How can We Improve Peshawar the City Of Flowers:

As a civil engineer In my city Peshawar we are going to make it more developed by introducing some different stuff in order to make it an adorable City Of my country,With the help of some modification in the drainage system and in the traffic control system we are going make some thing special in my state.

I am saying that we need to improve our drainage system and traffic system become we are Not a developed country we are underdeveloped countries how can we make it better and in how much time.
We need following steps:

  1. Drainage system:
  2. Concrete Road On it:

Drainage System Of my City:

For the Normal condition of my city we need to provide Following servers:

  • Domestic Severs
  • Strom Severs

Actually we need to improve the domestic severs in my state because we are not having rain fall mostly so the storm severs maybe little helpful but in the improvements if the domestic sever which is used for public places and shopping centers and the houses wastes and the institution wastes and hospitals which are mostly common here in my states and the hotel which are the main cause of the servers block age.

On the other side we are also having small industries in my city s for that waste come from the industries side will also required a different severs in order to keep the Environment Clean and Healthy.

We just construct those drains and now we are going in the Road making on it which will be used by only Bus service which we name a BRT(Bus Rapid transit)

BuS RAPID TRANSIT( BRT) :

We have a distance on 20 miles through which a concerts road will be completed in a time of 6 months the project is given to the chainese consultants and the workers and engineers are from my country and it is expected to complete the project in the months like it will be completed in the April 2018.

Road For The Buses :

The road which are used for this track will be fully made of high strength of concrete and there will be no asphalt Road.

Dimensions:

The lenght of the road is 20 miles :

The width of the road is 10 meter.

This track is passed over different areas like the market area and the high traffic places ,Their are some pacess when there road is very narrow and in those places we gave under ground road in order to not disturbe the traffic and all the station Of the buses are under Ground.

Why All the stations of the this service are under ground?

It is just because this road track is constructed in the middle of the Main GT road Going though the City that is why it will be hard for the passengers to go to the bus station and cross the high traffic road in order to provide safety All the bus stations are underground.

Here I have collected some Pictures in the Site where We are just going to make the girders for the Bridges in our Project

In the picture Below this is a girder used in a bridge Specification Of the Girder are

Lengh is 29 meter long
weight is 170 tons
Steel used is 17 tons.

WhatsApp Image 2018-01-31 at 13.49.20.jpeg

This is the steel work we have done with skill workers in order to get enough strength needed in the construction of bridge ,its according to the requirements needed and there is 30% safety factor we have used,In this design we just focused on the stability of the structure and not in economy because we have not a great quality of soil strata here and the soil bearing capacity is not high so we just focus on stability only.

WhatsApp Image 2018-01-31 at 18.21.41.jpeg

WhatsApp Image 2018-01-31 at 18.21.40.jpeg

In this picture i have shown that how we are giving the pre tensioning in the girder in order to make it stable for the moving load and not for a uniform load and it will be able to get more load than uniform loads.

WhatsApp Image 2018-01-31 at 18.21.39.jpeg

Some Information about the bus service;

  • There are total 300 buses.
  • They have separate track and only these buses will travel on it.
  • Every 5 min bus will be at next Station.
  • 20 cent will be the ticket price for the whole track.
  • Buses will be fully Air conditioned.

Sort:  

Extraordinary work and a lot of infos in this article-post. Your ideas can be put in practice if someone will help you. Photos made are good.

Irina V.

Awesome We are also working to develop our city of martyrs.

Its intresting for engener guys

Coin Marketplace

STEEM 0.19
TRX 0.15
JST 0.029
BTC 64210.52
ETH 2627.33
USDT 1.00
SBD 2.76