Quality project of President Duterte.

in #president7 years ago

Just opened the Cagayan de Oro Coastal Road, a 12.77 km project which started in 1997. It will serve as a bypass road starting from Brgy. Gusa in the eastern side all the way to the western side in Brgy. Igpit, Opol in Misamis Oriental, thus connecting six (6) barangays in the city and two (2) barangays in Opol.

Coin Marketplace

STEEM 0.17
TRX 0.15
JST 0.028
BTC 59989.12
ETH 2380.65
USDT 1.00
SBD 2.49