Best Guide to Solve CPM Question in Operations Assignment

Most of the time, when students solve CPM questions in operation assignment they get stuck in mid of calculation and after this task remains incomplete. Due to this kind of problem, they prefer to take operations assignment writing service from professionals, as they deliver unique services before the deadline.

How To Solve CPM Question in Operations Assignment.png

Along with it, they provide the best guide to solve CPM questions in few minutes and fetch the top grades in operation assignment:

1.Write Individual Activities: At the time of attempting CPM question, first, prepare the list of activities individually from work break down the structure of the project. From the beginning, you only have to work carefully so that no mistakes can take place in later steps.

Tip: The list will guide you to find the duration and then place these activities in sequence afterwards.

2.Place in Sequential Order: This is the easiest step, as you have to place all the activities of your project in series form by mentioning its predecessors and successors.

Tip: Properly analyze the question, then write its predecessor because the whole CPM diagram is made on its basis.

3.Prepare Network Diagram: After completion of the above steps, now you are ready to prepare the CPM diagram. But remember one thing, construct it according to your professor’s instruction, as there are two ways to develop it.

  • First is, to draw an activity on node network.
  • Second is, to construct a project on arcs.

4.Determine Completion Time: This is the crucial step, as you have to calculate the time taken by the project to complete each activity. This will be determined from experience.

Tip: In this step, you have to work attentively as CPM does not allow any kind of variation in the project once it is made.

If you calculate the correct time, then you can achieve the highest marks in the operations assignment.

5.Analyze Critical Path: Coming on this step, now you have to analyze the critical path, which means the longest path to complete the whole process.
It is generated based on these elements:

  • ES (Earliest Start Time): This represents the earliest time taken to start an activity, but its predecessor activity should be completed first.

  • EF (Earliest Finish Time): It defines the earliest finish time,i.e., the time taken to complete the same activity so that next can be started.

  • LF (Latest Finish Time): Time taken to complete an activity without any delay.

  • LS (Latest Start Time): Means latest finish time minus time needed to complete respective activity
    By finding the solution of these elements you can easily analyze the critical path of the project.

Tip: Just be attentive in this step, one silly mistake can make your whole answer wrong and bring poor remarks in it.

6.Finding Slack: It is the difference between the earliest and latest start time or vice versa. Slack is the chance of an activity’s delay. If the activity is delayed, then the whole project will be delayed. So to avoid this delay, you have to find the total time, as it represents minimum time to complete the project.

7.Draw CPM Diagram: Once, every activity time is calculated, you can easily draw a CPM diagram in few minutes without any chance of error in it.

With the help of this guide, you can easily find solutions to CPM question in a few minutes and improve your performance before the professor.

Summary: This article explains to the students that they can easily solve questions of CPM in operations assignment. Only they need to follow this guide’s direction to fetch the highest marks in it.