We "have built" walls yesterday. Today you will see how I have done a concrete floor.
1. I installed a special mark to know to what level pour concrete when the heavy rain. I had to wait and drain water. Funny footprints were left on wet clay.
2. When I have done concrete floor, the rain again. This has already not a problem, fresh concrete requires wetting.
3. Further, the walls should be built a little above ground level. This is corner stone.
To be continued... Follow me
Whats the 3 lines you have on the ground before the pour by the way walls are looking good
There are special marks to know level pour concrete
Ok did you use mesh in the concrete
no, I didn't use it
How thick was the conca
6-8 cm