This post is about the first project I did as an independent designer using natural and reclaimed materials to landscape a school yard.

Picking up my story where I left off, I returned to my hometown after my experience at Hamsah Farm. I didn't have a job or apartment to go back to, so returned home to stay with family, nearly 7 years after leaving for college. For the initial month or so, I revelled in being surrounded by mom's cooking and not having any major responsibilities. Eventually, I had to figure out what I could do other than lounge around and be useless.

One of the paths that I was considering was pursuing a master's degree in environmental design. A relatively new course that seemed ideal and appealing but would also mean shifting countries and large tuition fees. I was midway through writing application essays when I got a call from a college friend asking if I'd like to work on a project that was happening in my hometown. He's a metal artist that goes by the name of Mechanimal who was approached by a school to construct a play structure for them. They needed the rest of the space landscaped and having worked on designEARTH projects together, he suggested I work on the landscaping for them.

I thought this would be a great opportunity to use my design methodologies developed through Hamsah and designEARTH in a real life context. After a few brief interviews with our clients, we were all set to start around March of 2016.

h1.png

IMG_20160217_123356.jpg

The initial space to work on.

The clients were open minded about how the space could be designed. We figured we'd use techniques and materials from designEARTH to landscape the space. Mechanimal had other projects to work on and would be visiting around twice a month to work on his play structure and consult with me on the progress of the landscape. One of the cargo van drivers he found to transport his materials also turned out to be an all around handyman and was able to act as a contractor and a liason for the labour needed for the project.

2ec.png
Marking out paths.

We started off by marking out paths roughly where we wanted them, to separate and connect what would be the play structure, sand pit, lawns, decorative gardens and amphitheatre floor seating.

h2.png

Our contractor named Sadiq was able to organize the purchase of mud, cow dung and sand which were the primary materials we used for this project.

4.png

h3.png

6.png

Laying out mud for the floor seating of the amphitheatre.

The school building featured a curved section that opened up into the yard. They wanted to use it as a performance space or stage. We thought we'd provide a mud floor seating for the audience, following the curve of the stage. After the initial mud layer is laid out, we add lime, cow dung and water and work on smoothing it out.

7.png

h4.png

The same flooring was continued along the edges of the building. We had a lot of extra mud, so we decided to lay some down as the base for the sandpit. This turned out to not be a great idea because the mud was so fertile, even the sandpit needed weeding. The division between the sandpit and the rest of the space was done using ferro-cement. We needed this division, as we needed more sand for children to be able to jump in safely.

8.png

h5.png

The next step, after filling the sand pit was to add decorative elements. We chose a Mango tree as a center piece, that would eventually grow to provide shade to the area. We then constructed a circle to sit on around it, and added complimentary flower circles as well.

9.png

h7.png

The next step was to connect everything through path ways. We made paths using sawdust/mud and terracotta tiles. The tiles also are arranged in a hop-scotch formation in one part for children to have something extra to play on.
Sawdust when watered develops an extremely soft texture and is really pleasing to walk on barefoot.

IMG_20160328_160753.jpg

h9.png

The last step was growing the lawn. The space is meant for play, and a lawn seemed appropriate as it offered a different texture. I would've loved to grow vegetables or functional plants in this space but decided to leave them out as the primary purpose is the sensory exploration for the thousands of footsteps of kids playing in it. We grew the grass by individually planting blades instead of rolling out pre-made lawns. This seemed more appropriate considering the shapes weren't very linear.

10.png

h10.png

IMG_20160604_161250.jpg

After the grass grew out, this is what we ended up with. The mud floor is held together with the fiber from the cow dung and didn't crack too much. It did however experience some weathering by heavy rain. You can also see Mechanimal's finished play structure.

h12.png

This project took around 4 months to finish. We had anticipated on it taking only 2, but it's hard to find anything that works linearly here. You have to circumvent the whole alphabet before going from point A to B. This was also the first time I found myself almost entirely in charge of a project. It was a learning experience to organize everything from scratch. I had help through the contractor who organized the team of labourers, but being my first project there were certain factors I overlooked.

One such factor was maintenance. To keep the space looking the way it does in the last photograph takes a lot of effort, which I had to organize in addition to getting the work done. We also had a few nonseasonal rains that destroyed previous work. This seems to be a recurring theme. I have to keep in mind that any cobb or mudd construction should be covered while working on it. My profit margin grew smaller as the time and effort needed to implement my design increased. I did get regular payments though, and our clients were really amazing to work with. It also helped that I was staying with family and cycling to the school which was only 4 kilometers away from our house. I found a productive use of my time and was able to keep myself engaged. Most importantly, I discovered that my skill sets could be put to use in a professional context, and also provided a valuable addition to my portfolio. That did a lot to grow my confidence in using eco design and alternate ways of living away from the mainstream.

h13.png

The clients liked my work and so asked me to do something for another branch of the school with less space. I thought the perfect project would be to make vertical gardens, which I did from recycled material.

11.png

One of my first posts was on how I made these, which you can find here.

Untitled-5-01.png

| PAL-Minnow Support Project | Homesteaders Online |

sascc-01.png

Sort:  

Wow, this is super inspiring! I would love to be a kid playing here. Good work, and well implemented. I especially like your use of clay, lime and dung as a floor. How has this held up over time? Did you have a mold for the double tiered planters or were they purchased?

Thanks! So the problem with the floor is you need regular maintenance. When we were there, we were able to do it but the school didn't have the staff or budget to continue after we left. The biggest issue was that the lawn was pretty invasive, and started taking over the floor. Removing weeds and grass meant uprooting them which caused small craters on the floor. It didn't really hold up well over time. Ideally we should have done a few more layers and finished with a natural varnish like linseed oil. The flower planters were found randomly on the side of the road one day. They were pre-made and we still had to purchase them. Overall I'm happy with how it went, but in retrospect we could've done it better.

I am blown away by your work 😻💯♥♥♥

Thank you so much! Even I didn't know I was capable of this till I dove in headfirst.

Very cool @soulturtle, I'd like to see what it's like to walk on a bed of saw dust. Congratulations on getting that portfolio started back in 2016 by the way.

So, how tedious was the work of planting grass blades like you guys did? A lot of patience I bet! It looks beautiful and so do the vertical gardens... I may have to take this idea with car tires to our property, I like that a lot.

By the way the second part from my Honeymoon is up now!

Again, thank you for sharing, it's always inspiring for me.

It's not great at first, but if you constantly water the sawdust, it becomes really soft. It's probably like walking on a mix of grass and cotton.

The planting itself took us a couple of days, but the lawn took around a month to grow out. It's almost like a beard, you start with stubble. We didn't plant all the grass, we planted some and they multiplied naturally. Yeah, you can do so much with old stuff. Tire's have been used in so many other ways too.

Awsome, I'll be sure to check that post out.

Thanks, I like the mixture of grass and cotton sounds interesting, and I'm happy you didn't plant every blade of grass!!!

I love all the natural materials used and that you had the freedom to play around with it. Sounds like it was a good learning curve too.

Thank you! I still felt a little pressure as I did have to meet the client's satisfaction, but it was a lot of fun and I did learn a lot through it. Especially in terms of sourcing and organizing material and labour.

Congratulations! This post has been upvoted from the communal account, @minnowsupport, by Stace from the Minnow Support Project. It's a witness project run by aggroed, ausbitbank, teamsteem, theprophet0, someguy123, neoxian, followbtcnews/crimsonclad, and netuoso. The goal is to help Steemit grow by supporting Minnows and creating a social network. Please find us in the Peace, Abundance, and Liberty Network (PALnet) Discord Channel. It's a completely public and open space to all members of the Steemit community who voluntarily choose to be there.

If you would like to delegate to the Minnow Support Project you can do so by clicking on the following links: 50SP, 100SP, 250SP, 500SP, 1000SP, 5000SP. Be sure to leave at least 50SP undelegated on your account.

Coin Marketplace

STEEM 0.04
TRX 0.32
JST 0.100
BTC 64938.98
ETH 1924.48
USDT 1.00
SBD 0.39