Official Report | World Smile Project Int Program Update, Free Education Center Construction Part 2 [Payout 50% to Support #burnsteem and @worldsmile]

in STEEM FOR BETTERLIFE2 years ago

Based on the decision of the World Smile Project International internal meeting which was attended by @el-nailul, @heriadi, @klen.civil and I as the World Smile Project Int program manager, we decided to immediately implement the Free Education Center project in East Aceh Regency, project development This is based on the successful construction of the Free Education Center in North Aceh District some time ago.

The background of the construction of the second free education center is based on the aspect of the need for educational infrastructure in Madat District, East Aceh Regency, this was previously planned and became a waiting list for the implementation of the World Smile Project program. We have also designed other essential programs in countries that already have World Smile Project representatives such as the Philippines, Nigeria, South Africa, Venezuela, Pakistan and Indonesia.

The scheme of changing the work concept is a new thing in this period, we will ask all state representatives to submit a work program so that it can be carried out according to schedule, later every week we will try to carry out the program in rotation in the countries we mentioned above, this is certainly inseparable from support members who totally and loyally support the Smile World project through Share rewards to the @worldsmile account.

The change in the working mechanism was based on the decision of the World Smile Project Int deliberation so that the effectiveness of project implementation could be carried out on a regular basis even though on a small scale, in contrast to the previous one which was more oriented towards projects with a larger scale.

Considering that the exchange rate of Steem and Steem Dollars against conventional currencies has decreased drastically at this time, we from the management have carried out Project Implementation Risk Management so that even if price fluctuations occur, it will not have a serious impact on the completion of ongoing and future projects. . Project Management Risk will be updated when the program is started.

Second Free Education Center Initial Survey

Today we from the WSP International Team (@heriadi and myself @irawandedy) and WSP Indonesia Representatives (@klen.civil and @sofian88) and @alee75 who have consistently supported the WSP Project conducted an initial survey of the construction site of the second Free Education Center.


Picture of the initial survey of the second Free Education development

This survey was conducted to ascertain the location of the construction and the beneficiaries of the program that will soon be implemented. The implementation process after the initial survey is:

  1. Calculation of design and Budget Plan which will be prepared by @klen.civil and @sofian88 as the Technical Team of WSP Indonesia. The calculation of the Budget Plan is carried out based on the latest survey of the current material/material prices, because each project location has a price difference that is closely related to the distance and location of the project development.
  2. Wage meeting/coordination between the WSP Team and the Head of Builder
  3. BowPlank Installation
  4. Regular work and monitoring by the Technical Team
  5. Evaluation
  6. Project Handover

Thus, we convey this official announcement, hopefully it will become a reference for all elements of the World Smile Project so that the projects planned and carried out can be completed on time and can be utilized as well as possible to support the development of Human Resources in East Aceh Regency, which is a post-prolonged conflict area.

Hopefully the members and the Steemit Team (@steemcurator01 and @steemcurator02) can support the implementation of this project like the previous projects.


BAHASA

Berdasarkan hasil keputusan rapat internal World Smile Project Internasional yang dihadiri oleh @el-nailul, @heriadi, @klen.civil dan saya selaku manager program World Smile Project Int, kami memutuskan untuk segera melaksanakan proyek Free Education Center di Kabupaten Aceh Timur, Pembangunan proyek ini didasari dari suksesnya pembangunan Free Education Centre di Kabupaten Aceh Utara beberapa waktu yang lalu.

Latar belakang pembangunan free education center yang kedua didasari dari aspek kebutuhan terhadap infrastruktur pendidikan di Kecamatan Madat Kabuaten aceh Timur, hal ini telah direncanakan sebelumnya dan menjadi waiting list pelaksanaan program World Smile Project. Kami juga telah merancang program esensial lainnya di negara-negara yang telah memiliki perwakilan World Smile Project seperti Philipina, Nigeria, Afrika Selatan, Venezuela, Pakistan dan Indonesia.

Skema perubahan konsep kerja menjadi hal yang baru di periode ini, kami akan meminta seluruh perwakilan negara untuk mengajukan program kerja sehingga dapat dijalankan sesuai dengan jadwal, nantinya setiap minggu akan berupaya melaksanakan program secara bergilir dinegara yang kami sebutkan diatas, hal ini tentunya tidak terlepas dari dukungan member yang secara totalitas dan loyal mendukung proyek Senyum Dunia melalui Share reward ke akun @worldsmile.

Perubahan mekanisme kerja didasari dari keputusan musyawarah World Smile Project Int agar efektifitas pelaksanaan proyek dapat dijalankan secara reguler meskipun dalam skala kecil, berbeda dengan sebelumnya yang lebih berorientasi pada proyek dengan skala yang lebih besar.

Mengingat nilai tukar Steem dan Steem Dollar terhadap mata uang kovensional telah menurun secara drastis saat ini, kami dari manajemen telah melakukan Manajemen Resiko Pelaksanaan Proyek sehingga meskipun terjadi fluktuasi harga tidak akan memiliki dampak serius terhadap penyelesaian Proyek yang sedang dan akan dijalankan kedepan. Risk Manajemen Proyek akan diupdate saat program dimaksud mulai dijalankan.

Survey Awal Free Education Centre yang Kedua

Hari ini kami dari Tim WSP International (@heriadi dan saya sendiri @irawandedy) dan Perwakilan WSP Indonesia (@klen.civil dan @sofian88) serta @alee75 yang secara konsisten mendukung Proyek WSP melakukan survey awal terhadap lokasi pembangunan Free Education Centre yang kedua.


Picture of the initial survey of the second Free Education development

Survey ini dilakukan untuk memastikan lokasi pembangunan dan penerima manfaat program yang akan segera dilaksanakan. Adapun Proses pelaksanaan setelah survey awal yaitu:

  1. Perhitungan desain dan Rencana Anggaran Biaya yang akan disusun oleh @klen.civil dan @sofian88 sebagai Tim Teknis dari WSP Indonesia. Perhitungan Rencana Anggaran Biaya dilakukan berdasarkan survey terbaru terhadap harga material/ bahan saat ini, karena setiap lokasi proyek memiliki perbedaan harga yang erat kaitannya dengan jarak dan lokasi pembangunan proyek.
  2. Rapat/ koordinasi Upah kerja antara Tim WSP dengan Kepala Tukang
  3. Pemasangan BowPlank
  4. Pekerjaan dan monitoring secara reguler oleh Tim Teknis
  5. Evaluasi
  6. Serah Terima Proyek

Demikian pengumuman resmi ini kami sampaikan, semoga menjadi referensi bagi seluruh elemen World Smile Project sehingga proyek yang direncanakan dan dikerjakan dapat diselesaikan tepat waktu dan dapat dimanfaatkan sebaik-baiknya untuk menunjang pembangunan Sumber Daya Manusia di Kabupaten Aceh Timur yang merupakan daerah paska konflik yang berkepanjangan.

Semoga member dan Tim Steemit (@steemcurator01 dan @steemcurator02) dapat mendukung terlaksananya proyek ini seperti proyek-proyek yang dijalankan sebelumnya.