A Day With Steem Memory Game

in Steem Kids & Parents11 months ago

1000390887.jpg

It is Sunday and I am so happy today, as for the first time since I visited my elder sister in Abuja, she took me out. I thought she was joking when she told me to dress up for an outing, so I smiled at her because she likes joking.

As I dressed up, my sister and I then went out to a very calm and relaxing place in Abuja and enjoyed ourselves. At first, we took several pictures as we stepped out. We took several pictures before we went to a certain place where we had both food and drinks and ate.

1000390888.jpg

While relaxing, I then played the Steem memory game, as it is my favorite game. This time around, I did so well in the game, as I completed it in less than 1 minute. I used 56 seconds to complete the game.

My Steem Memory Game Results! 🎮

1000390889.jpg

Game Details

  • Mode: Free
  • Status: ✅ Completed
  • Score: 1423 points
  • Time: 0:56.19
  • Moves: 32 moves
  • Perfect Matches: 10

Game Result

  • Played: Sun, 10 Aug 2025 14:16:20 GMT

Score Breakdown

  • Time Bonus: 243.809 points
  • Move Bonus: 680 points
  • Perfect Match Bonus: 500 points

As you can see, this is my most played Steem memory game since I have been playing the game; this is the time that I completed the game in less than 1 minute.

Sort:  
Loading...

TEAM 6

Congratulations! This post has been voted through steemcurator08 We support quality posts, good comments anywhere and any tags.


1753883118875.png


Curated by : @xkool24

Coin Marketplace

STEEM 0.04
TRX 0.32
JST 0.099
BTC 63116.85
ETH 1835.65
USDT 1.00
SBD 0.38