You are viewing a single comment's thread from:
RE: Gridcoin poll: Should we remove TNGrid from the whitelist due to no available work units? (vote until March 17)
5 days left in this poll:
- 78% of the voter shares want to vote out TN-Grid out of the whitelist
Considering the fact that TN-Grid is redesigning their wus I believe this poll has been very hasty and will remove a potentially good project from the Whitelist.
If there was ever a more important reason for the Greylist, situations like this are what it would be for.
Or we could just decide that the poll is invalid since its based on a different situation.
the poll has ended: