Power Generation with Gigajoule

in #gigajoule5 years ago

Gigajoule was born as an answer to the problem of access to electricity, which affects millions of people around the world, but this problem is especially acute in African countries. The current model of electricity production in these countries uses various power plants, many of which are economically and environmentally unsustainable, however, despite their unsuitability, their aggregation is far from being able to satisfy the growing demand for electricity. Gigajoule is a quick generation and deployment system that can expand existing generation capacity in developing and developed countries.

The Gigajoule team spent years preparing to introduce the first three floating power plants in Nigeria. Nigeria's choice as the top priority for the Gigajoule hydroelectric power station solution was determined by the abundance of natural gas, the existing national transmission system and World Bank support to confirm the government’s commitment to pay for the purchase of electricity generated through the power plant. Purchase agreement. The first 3 projects will be completed in 3 different locations: Cross River State, Anambra State and Delta State. More projects are planned for Nigeria and other countries in Africa, the Middle East, Southeast Asia and Central America, as demand will remain unsatisfied for decades.

Gigajoule is a project that uses the most advanced technology in the form of power plants in floating power plants. Each floating power plant is mounted on a barge and consists of two turbines with a gas engine SGT-A65. The capacity of the floating power plant is 132 MW. The technology underlying Gigajoule floating power plants is provided by Siemens and each project consists of 4 barges with a total capacity of 528 MW.

Electricity, for the most part, is a worldwide utility that is easily accessible to consumers. But when it comes to the energy industry as a whole, conditions turn into strict regulation, a monopoly, or even complete chaos. Electricity production itself is only half the battle — using existing networks, matching supply and demand and reducing greenhouse gas emissions from their production is a difficult task.

The principle of the Gigajoule project

Gigajoule is ready to implement three projects with a capacity of 528 MW each at various facilities in southern Nigeria, in the immediate vicinity of the gas supply and electricity evacuation infrastructure.

Significant work has been done at each of these facilities to secure production licenses electricity, confirmation of studies on gas supply and transmission of electricity. Additional work includes preliminary environmental approvals, design of floating facilities and infrastructure, confirmation of economic viability, and necessary precursor negotiations to conclude an electricity purchase agreement with the federal government.

Nigeria alone has direct demand for another 10,000 MW. In the rest of Africa, direct demand is 20,000 MW. Worldwide, with the exception of Africa, demand is estimated at another 30,000 MW.

Floating power plants using SGT-A65 engines have several important advantages:

  • Location flexibilityTwo SGT-A65s are mounted on a floating barge, thus creating a complete mobile propulsion system.
  • A much smaller footprint is required than for land-based power plants. This provides many options for locating FPPs as close as possible to gas supply and local infrastructure for evacuating electricity.
  • Ownership of FPPs is always maintained. These assets can be deployed on other sites, if necessary.
  • The speed of manufacture, installation and commissioning is faster and easier than that of ground-based counterparts.
  • Gigajoule floating power plants will be assembled at Appledore Shipyard UK with an indoor dry dock allowing production throughout the year.
  • After the floating power station arrives at the deployment site on a heavy ship, it will be connected to the gas supply and mains in a relatively short time.
  • Simultaneous creation of ground infra structures for FPS units, dock, gas pipelines, substations and power lines.
  • The savings from scaleFPP modules are deployed in groups of four per site, although this can be increased or decreased depending on requirements
  • In a typical deployment configuration, eight SGT-A65 Modular Generator Sets in operation mean that maximum availability can always be maintained for a typical twenty-year life.

Key Token Sale details

GIGJ = 1$

Soft Cap: 10 000 000$

Hard Cap: 50 000 000$

Pre-sale IEO: 01.10 - 20.10

You can still tell a lot about the project. To get acquainted in detail with all the nuances of the company, website, team, Whitepaper, roadmap, I will leave the necessary links below in the description. In conclusion, I want to say that this is a modern, innovative project that can make a breakthrough in the cryptocurrency field and bring profit to its investor in the near future.

Additional Information:

Website: https://gigajoule.io

Whitepaper: https://secureservercdn.net/160.153.137.210/d37.ba6.myftpupload.com/wp-content/uploads/2019/09/Gigajoule-Whitepaper-v9.pdf

Bitcointalk: https://bitcointalk.org/index.php?topic=5182913.0

Telegram: https://t.me/Gigajoule_group

Twitter: https://twitter.com/GigajouleT

Facebook: https://www.facebook.com/gigajouletoken

Author: berk3berk (https://bitcointalk.org/index.php?action=profile;u=2534145)

ETH wallet: 0x65465d5e32D9228CCF5801D58282Aa537CDe182f

Sort:  

A new interesting project. This company has a great future, which will not make us wait. joining it you will never regret it. This Project uses the latest technologies in the field of crypto currency. Every day it attracts more and more attention.

A good project with great potential that promotes interesting ideas and innovations. Strong and professional team.

I think this is a project that has a good innovation with this project.Offer to take part in ICO! This will help to make a lot of money. I recommend everyone to pay attention.

Very reliable project with a lot of money. This is a interesting Start-up. This Start-up is revolutionary.

Coin Marketplace

STEEM 0.28
TRX 0.12
JST 0.033
BTC 71443.06
ETH 3660.17
USDT 1.00
SBD 3.73