MIGHTY BATTLES GAME REVIEW

in #gaming8 years ago (edited)

Good day steemians, welcome to my blog. Today we're going to do a game review on Mighty battles. In my last post was were I shared a game review on Kill shot bravo. You can still check it out here
So today we will be doing a game review on Mighty battles

images (31).jpeg



Mighty battles is an action strategy game and a fantastic big time game filled with quite a lot Action Packed 1v1 Strategy Duel, you'll also Play the 1 Free Tower Defense Shooting Game on it's activities. It's also a genre bending shooter game whereby you'd get to play as a fighter then combining shooting and tactical strategy with card collecting, events and real-time 1v1 matchmaking to deliver a battle experience never seen before on mobile devices.

This mighty battles actually is really a great and awesome game to play, it has so many features and a particular one based on Competing worldwide, there on the game, you will Challenge other players around the world in live 1v1 multiplayer battles, also you'll Earn medals for each victory, and as well climb through the divisions and leaderboards into the highest tiers of competition. Hone your shooting skills and tactical mind to become the best player in the world, which is simply just there about on the gameplay aspect of playing it. Here in this game as your basic simple missions is Just about destroying enemy bases, therefore you will need to plan your troops and place them strategically for attack or maybe defense. You as well can also shoot down your enemy’s army using the various weapons such as the Machine Gun and the Rocket Launchers for deployment points, and thus use the points to deploy more troops.

More than 40 different types of troops are available to bring into battle too. If you've maybe have felt that you’ve developed a bond with your king in Clash Royale owing to the countless hours you’ve spent with while playing the game, then Mighty Battles puts you right in his shoes. There in the game, You’re been faced with another base right up front and just like Clash Royale, you’re going to dish out varied troops to destroy the enemy base or counter the troops that are coming your way. While the novelty does last for a while, it couldn’t just live the boredom that seeps in after a couple of hours while doing the activities and playing the game. Mighty Battles actually can certainly do so well and end up being a game that you can want to come back to play if it were to simply fix these glaring issues. But for this game in particular, I'd simply advise you to give it a try generally by just playing the game.

images (32).jpeg



While playing this game, you can easily just play other battles against other players, what’s really good about this game is that you can join a clan and fight clan battles. You also can share or donate items between each of the clan members.

You can play not just with players around your neighborhood, but players from around the globe. This is not just a chance to play this games, compete, or maybe work as a team, but to meet new friends who also do share the same interest aspect with you too.

There are equally no ads in this game though but just except a non-pushy incentivized video ad after winning a battle on the game and while you can as well buy gems through in-app purchases, The game is generous with rewarding you more enough of gems just for playing the game alone and the chests with gems spawning randomly on the game map from time to time like it's quite dependent of it's actions too and also about a fair competition compared to other mobile games with maybe of the same similarities as well.

This game was released on the November 6 2017 and looking at this date, it's typically just showing that the game was released not a long time at all as probably it was released like for few months ago but to tell you ever since it was released they've been doing quite good since then both on the visibility aspect of the game and the positive reviews and every nice good comments made by it's users all were absolutely encouraging to see cause actually lots of people really liked the game so much so that equally makes no much difference on it though. And Talking about the visibility aspect of the game, right now the Game has a minimum total of about 1 million downloads on play store and still counting as well cause literally it's a game that is been liked by all for the fantastic way it plays and all other things about it both the positive reviews and comments made by the users who've actually played the game. So There again, it's really a great game and another fun thing about it and why I loved it this much is because there wasn't much of any negative reviews about it or Rather I'll say there wasn't at all. So generally it's all an excellent game with one of the best graphical designs on it as well.

images (33).jpeg



The game was created and developed by hothead games, which as well are the fantastic game developers of most of other great games like the kill shot bravo sniper fps game, the rivals at war fire fight game, the hero hunters, the big win racing game and the last but not the least which is just about the contract killer sniper game. so typically there games are all good and played quite well in a fantastic different way from other games and basically they deal more on developing action games so there's actually a bit difference there cause all has it's way of reasoning about it.

So after the release of the game were some few features and factors that got added up to it which added up in making the game to become a more fantastic one like it is now. So here are the newly things and features that just got fixed and added up to the game; the Bug has been fixed and many of improvements has been done as well, they've fixed the level of chest rewards during Clan Battles, improving amount of resources awarded after winning a match, there are now new matchmaking Improvements, there are New Orders on the Mighty Missions aspect as here you're expected to complete daily missions to earn juicy rewards, you'll Earn the Grand Prize of 14 Dr volt cards. This challenge event really takes place on the new Space Station map. So in the general as everything got fixed and new features added to the game I'm quite sure it really made a lot difference and now the game functions well in an appropriate way it should though even without this features the game is still a standard action game that plays very well in a fantastic way too.

unnamed (4).jpg



GAMEPLAY

Speaking about the gameplay, the gameplay aspect of this game actually is nice overall and does battles fantastically in a normal way as a good game should battle, the fighting aspect is really cool and made the game sound so much interesting while playing it, as every other game would play, this game is just something else and does plays differently from other games and as an action strategy game it is, I'm quite sure it literally has a lot differences on it which is why every bit of the game is just so fun and it's quite pleasant to anyone playing the game at any moment in time.

Actually speaking, playing this game is quite simple, here If you really want to be good at playing this game, you simply should just consider taking some advices. If there is one, we would suggest you to make your squad wisely since there are only 8 units available at a time. Balancing the strength is the most important thing to do and by doing so you're equally having a cannon fodder along with the helicopters and tanks. In Mighty Battles for Android, it is mostly better for you to not be hasty in deciding things. Before upgrading units for example, make some experiment first. There will be bucks needed as well to do all this, Since they are hard to obtain, think thoroughly before you do upgrade any units. Your mission in this game is totally just simple, here your mission is to destroy enemy bases, therefore you will need to plan ahead your troops and place them strategically for attack or mayne defense.

You can also shoot down your enemy’s army using the various weapons such as the Machine Gun and Rocket Launchers for deployment points, and thus using the points to deploy more troops. There are equally More than 40 different types of troops that are available to bring into battle too.

images (34).jpeg



GRAPHICS

Speaking about the graphics, here the graphical aspect of Mighty battles game is really just kind of a good and bad one, but mostly it's generally a cool and simple one when looking at it and it isn't that too bad for a game rather it's all added up to the feel of it which is as why everything goes normally the way it should on the game and it's possible to say that you can clearly see every part of the game entirely though it wasn't that too bad but it's all good anyway, like I said earlier before, it's a game with few of negatives and positive, The good there about the game is first off, The smooth designs of it's characters, The characters move fluidly and look good. Also, The fighting models are good and textures aren't too blurry. The blood is very realistic as well, splattering and staying there for the rest of the game. The bad is just that there are quite a few graphical glitches and some clipping problems. but it's mostly a good looking game overall, so the graphics is simply a nice one and a game to try out definitely.

images (35).jpeg



SOUND

Speaking about the sound, here the sound aspect of Mighty battles game actually is really a cool one to hear of and it really does plays in a cool way which added up to the feel of the game and the vibes too totally made a lot sense towards how the sound effects plays, which is really a fantastic something for such type of game like this. The sound aspect actually is just an excellent one. The effects on it are really nice and sounded so much realistic you never could thought about. the voices of the dieing one when you shoot one and also about the troops of enemies are Just brilliantly designed. The soundtrack really isn't all there though, but literally it all adds to the feel of the game. The voice acting is moderate at it's best but can be forced and stiff most times, so overall the sound aspect is just a cool one as it played really well in a nice way, making the vibes higher of what you may thought of it to be.



FEATURES

• training mode, here it's all about you Practicing with new units and squad combinations before you take on real players around the world.

• Defend your base, here you'll simply need to
Destroy enemy Units with Gatling Guns, Rocket Launchers, Bombing Runs and Turrets as well,
Deploy the right unit cards into battle to help fight off attacks, and turn tower defense into a base attack.

• Build your squad up, here you'll need to build an army of awesome unit cards to lead you into war, also Collect more than 40 different soldiers, vehicles, guns and base defenses.
Send all your troops down MOBA style lanes to win the battle.

• Earn rewards and upgrade your squad, here you can earn Victory Crates simply by defeating your opponents in battle and unlock them all just to collect more units, bucks and gold as well.

mighty8.jpg



DETAILS ABOUT THE GAME

• Developer........Hothead games

• Version...........1.4.2

• Offered by.......Hothead games

• Released Dates.......November 6 2017

• Platform.......iOS Android

• Category.... Action/Strategy

• Content rating.....7+

• Language...... English and others

• Genre......Strategy

Available on play store!



GENERAL RATINGS

• Gameplay........8/10

• Graphics.......8/10

• Sound.......7/10

• Controls.......8/10

• Scare factors.....5/10

• Storyline......8/10

• Overall rating.......8/10

images (31).jpeg



FINAL WORD

In overall, this game is good, it's simply just a simple to play fantastic strategic game and as well featuring a lot More of other great features on the game such as the rewards earning and a squad to help make your gameplay fantastic. The game may seriously have advertisement and timed processes, but it is an engaging and enjoyable strategy game to play. It’s also a free to play game so it is recommended that you give it a try. So go get it on play store. Thanks!!

Thanks for reading!!!




image source;1-2-3-4-5-6-7

Check my previous reviewed games

KILL SHOT BRAVO GAME REVIEW

STICK WAR LEGACY GAME REVIEW

SNIPER STRIKE SPECIAL OPS REVIEW

SHADOWGUN LEGENDS GAME REVIEW

IDLE HEROES GAME REVIEW

VAINGLORY 5V5 GAME REVIEW

THE WALKING DEAD NO MAN'S LAND REVIEW

GRIM SOUL DARK FANTASY SURVIVAL GAME REVIEW

LEGACY OF DISCORD FURIOSWINGS GAME REVIEW

UNKILLED GAME REVIEW

DQmS1VYzPn492k7FQEmfEEWcjp72tZwKM7FQiLvZzMNNy8U_1680x8400.jpg

IMG-20170927-WA0031.jpg Thanks to @jodipamungkas for the awesome badge.



DQmS1VYzPn492k7FQEmfEEWcjp72tZwKM7FQiLvZzMNNy8U_1680x8400.jpg

IMG_20171105_001316.jpg
Thanks to @chimzycash for this lovely badge

DQmS1VYzPn492k7FQEmfEEWcjp72tZwKM7FQiLvZzMNNy8U_1680x8400.jpg

Kindly

upvote

Resteem and

Comment.

@valency1

Goodluck to you as you gambol this game

Coin Marketplace

STEEM 0.04
TRX 0.32
JST 0.089
BTC 61662.76
ETH 1714.79
USDT 1.00
SBD 0.38