6 tips for bathroom renovation in Toronto

in #bathroom5 years ago (edited)
  1. The floor drain is shifted by the plumber and the mason. Otherwise, the slot is shallow, the backfill is less, the floor drain is installed, and the odor-resistant core can not be installed. You don’t want to open the toilet door. Come on? Of course, the word "sour" is more suitable.

  2. Deodorization of the toilet: The installation of the toilet should be carried out in strict accordance with the requirements. For example, first flatten the sewage pipe, then use putty to transfer the round water pipe around the floor and smooth it, then the flange is close to the ground. Of course, many toilets will not be deodorized if they are casually loaded. Why? Because the toilet is closed, directly cover the closed bucket, and the odor will not run out after the glass glue is filled around. Then pay attention to the glass glue, including the two behind the toilet. The hole that should have been screwed. However, if your toilet is leaky behind, then the toilet and the ground are not so easy to seal, then please install the toilet according to the specifications, or wait for the acidity.

  3. The probability of water leakage after the PPR pipe is installed is much less than the leakage rate of those interfaces at the time of installation. For example, the angle valve or any place where the raw material belt is used, if it is not suitable for the first time, when reinstalling, the raw material belt should be re-wrapped, and then the interface is checked for leaks.

  4. The angle valve is not in a hurry to buy, you can wait for the brick to be attached, because if the wall is not flat, you may need to buy a long angle valve.

  5. The shower room is recommended to stick the film, it is best to stick the original film, and the tempered glass also has the probability of self-explosion. When you don’t want to take a bath while YY, it suddenly bursts. (Amount, don’t be dirty, I said the glass exploded. ), then the scene is full of blood, the scene is too beautiful.

  6. All seams, wall and floor junctions, floor tiles and sills at the junction of the stone, and the junction of the floor tiles and the water barriers, please fill in, even if you plan to sew later, including the intersection of the slabs and the tiles at the junction of the wall tiles.

So these were 6 tips from bathroom Renovations & Contractors in Aurora to keep in mind before hiring any contractor.