spread of base A

in #aceh7 years ago

image image imagethis is the work of the previous vote connection, which is leveling the already-laid base, by using heavy equipment called grader, for the formation of the road body in accordance with the planned image, after being directed to the needs of the road body, or the overall width, the weight is called compack so that the base that has been dibentyk solid, so that the road is not damaged, because before doing the job of paving, we must really solid, density test with menggunsk sand cone, which then will be tested lab, so do watering with water then compiled the pore pore is missing,

Sort:  

Hoe ku folow, soe gata

Congratulations @contractor! You have completed some achievement on Steemit and have been rewarded with new badge(s) :

Award for the number of comments

Click on any badge to view your own Board of Honor on SteemitBoard.
For more information about SteemitBoard, click here

If you no longer want to receive notifications, reply to this comment with the word STOP

By upvoting this notification, you can help all Steemit users. Learn how here!

Coin Marketplace

STEEM 0.16
TRX 0.16
JST 0.030
BTC 59035.93
ETH 2519.79
USDT 1.00
SBD 2.47