Pembuatan saluran

in #aceh7 years ago

imagethis is a photo of the location of the project that the channel will be constructed by looking at the existing plan on the planned drawing, then it will be pegged, so in this case it needs the cooperation of the local village official or called the geuchik pack and his device with the supervisory consultant and partner before the work is done

Coin Marketplace

STEEM 0.17
TRX 0.15
JST 0.029
BTC 62094.48
ETH 2416.53
USDT 1.00
SBD 2.56