How A House Is Being Built From Foundation

in Steem For Pakistan โ€ข 8 months ago

20250604_184410.jpg๐’€๐’๐’–๐’๐’ˆ ๐‘ฌ๐’๐’ˆ๐’Š๐’๐’†๐’†๐’“๐Ÿฆบ

Before building a house, we need to have the surveyor, architect, site engineer or a contractor,a surveyor is a person who surveys the land , so that he or she could know the actually square meter of the land, after surveying, the architect comes in, the surveyor hands over the survey plan to the architect, so that he could places a proposed building on it base on the client needs or wants.
The site engineer or contractor is a person who make the drawing become a reel life story,this is by setting out the building into an open area which was cleared, and the have removed tress, and rocks or stone from the land, the grasses are being cut off and the ground is free.
โ€ขRope and pecks is being used in setting out the building line.

EXCAVATING THE FOUNDATION

IMG_20251029_102518_013~2.jpg ๐’˜๐’๐’“๐’Œ ๐’‡๐’“๐’†๐’”๐’‰๐Ÿ˜€

This process is by digging a deep trench for the foundation, the depth depends on the soil type, where you could likely see a stable soil.

IMG_20251031_075915_720~3.jpg
๐’•๐’‰๐’Š๐’” ๐’Š๐’” ๐’•๐’‰๐’† ๐’„๐’‚๐’”๐’•๐’Š๐’๐’ˆ ๐’—๐’Š๐’†๐’˜

IMG_20251029_123414_855~3.jpg
๐’˜๐’‰๐’†๐’ ๐’•๐’‰๐’† ๐’Š๐’๐’”๐’Š๐’…๐’† ๐’‘๐’†๐’„๐’Œ๐’Š๐’๐’ˆ ๐’˜๐’‚๐’” ๐’…๐’๐’๐’†

After the foundation digging and the trenches of the foundation is leveled we do what the call an in pecking.
After the inside pecking is done, the will pour concrete into the foundation by the use granite and sand with cement and water.

BUILDING THE STRUCTURE

IMG_20251101_091841_212~2.jpg ๐‘จ๐’• ๐’˜๐’๐’“๐’Œโš ๏ธ

This is the process which the laying of blocks or bricks are being construct to form a wall in a building.
After building to the D.P.C the would fill it with filling sand, after that it would be continued to the lintel level and beam,the lintel will be constructed by the carpenter and the will cast it.and the lintel and beam,the will continue it to the roof level and a roof will be constructed on top of the building, before other types of site workers comes in which are:

Workerstheir duty
Electricalwiring
Masonplastering
Tillingtiler
Plumbingplumber
Welderdoor and protectors
Paintingpainter
Screedingscreeder
And more....
Sort: ย 
ย 8 months agoย 

Upvoted! Thank you for supporting witness @jswit.

Loading...

You have got an awesome post, making detailed post is encouraged, I'm also advising that you visit other users and support with your comment and vote.

Remember consistency is the key. Cheers



Curated by: @ okere-blessing

Coin Marketplace

STEEM 0.04
TRX 0.32
JST 0.098
BTC 64054.40
ETH 1882.24
USDT 1.00
SBD 0.38