National Cenotaph

in #walkwithme6 years ago

National Memorial Building a memorial dedicated to the memory of the martyrs of the Liberation War of Bangladesh. It is located in Savar. Architect Syed Mainul Hossain has drawn up the design.There are ten mass graves of the freedom fighters. In this memorial, tributes are included in the public when foreign statesmen come to Bangladesh officially.

..................................
General information
..................................
Status
In memory of national martyrs
Style
Universal monument
.................
Location
.................
Savar, Bangladesh
............................................
Construction has started
.............................................
1978
Complete
1982
............
Height
............
Roof
150 feet (46 m)
.........................................
Design and construction
The architect
.........................................
Syed Mainul Hossain

.......................................................................................................
History:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
.......................................................................................................
On December 16, 1972, Bangladesh's President Sheikh Mujibur Rahman laid the foundation stone of this memorial at Nabinagar near Dhaka-Aricha highway, 25 kilometers away from Dhaka city. In 1978 President Ziaur Rahman took a vow to build a memorial and the design was called. The designs of Syed Mainul Hossain made in 57 designs received in June 1978 were accepted. In 1979, the construction of the main monument began and in 1982, shortly before the Victory Day. According to a project taken in 2002, there is a plan to set up a flamingo, a wide variety of mural and a library.

The foreign tourists visiting Bangladesh have their own memorial plant here. The architectural design of the Government of the People's Republic of Bangladesh was formulated by designing the architectural design of all other construction projects, including the Great Plans and Natural Plan of the project without the memorial monument. The construction work was started in July 1972 and ended in the year of 1988. Public Works Department under the Ministry of Public Administration and Public Works Ministry of the People's Republic of Bangladesh completed the entire construction work. At present, construction of the building is completed at three stages at a total cost of Taka 13.00 crore.

Sort:  

Wonderful man

Nice post! I will follow you from now on. +vote

Coin Marketplace

STEEM 0.30
TRX 0.11
JST 0.033
BTC 64271.38
ETH 3157.43
USDT 1.00
SBD 4.25