In our country, everyone is enjoying the Eid holiday with family, but I am working in the office due to my duty. I am an electrical engineer. Annual electrical maintenance is going on in my office. I have been working day and night continuously since yesterday to centrifuge the transformer oil. I went home at 3:00 pm to rest for two hours. After showering from home, I left for the office at 7:00 am.
Time to go to office
Then I reached the office and found that the transformer centrifuge machine was shut down for about an hour with a fault code. I came and saw the fault code and understood that the machine tripped due to overvoltage. I change the lines of electricity on the spur of the moment and start the machine running. Then, at 8.00 in the morning, I started to centrifuge the transformer oil again.
Restart the transformer centrifuge
Then I had breakfast. After breakfast, an idea came to my mind. We check the oil quality of the transformer oil in our office that is left to be centrifuged. I don't have a one-liter glass bottle. Then, I take out the oil from the transfer and check the quality with a bottle of oil. Then, I collect all the oil reports with me.
Oil test time
I centrifuge the transformer oil until 2:00 pm. Then, I check the oil of the centrifuged transformers again in the machine. After centrifuging, the quality of the oil is reported to be good. Then I have lunch, come to the office, and rest for an hour.
Transformer centrifuge is running
The factory looks deserted, as all the employees are on leave. I took pictures from one side of the factory. Some employees are in the office for maintenance work.
The office is empty due to Eid closure
Then I find out that there is some air in the oil of the centrifuged transformers. The transformer has some points to vent the air by opening it. Then, turn on all the transformers one by one. I finish two days' work. It was great to complete the job of transformer oil centrifuge with responsibility.
Oil test result
Oil centrifuge result<40 KV [The quality of the oil is poor] If line voltage 33 KV
Oil centrifuge result>40 KV [Oil quality is good] If line voltage 33 KV
After commissioning the transformer after maintenance
Then, at 6:00 pm, I left the office and rushed home. I went home, took a bath, and rested for an hour. Then, I created a post on the Steemit platform and submitted it. I was very tired because, for the last two days, I could not sleep for office work. So, I ate fast food and slept at night.
This is my Twitter share link :
https://twitter.com/mahadih83660186/status/1782369680205984239?t=OZPFgzDJSVwMkUsLTnevdA&s=19
Upvoted. Thank You for sending some of your rewards to @null. It will make Steem stronger.