Hello Guys, hope all of you are keeping well. Now I have spent two weeks in here and came to know lot of important things from here. So I decided to share some of those important things with you and briefly explain how we are going to make this ground. Ok first of all I would like to tell you this is a ground project it should have a 1:100 slope from center to corner. According to that slope 10m to 10m from center to corner should have a 100mm slope.We take those levels by using level machine and those 10m points we place pegs that mark the correct levels.
Next step is little bit hard. top soil should be filled from ground level to the correct level that mark in the pegs.I also would like mention in here how we make the top soil for this project.According to BOQ soil , coir dust and compost by mixing 3:1:1 ratio in respectively we make the top soil for this project.
Before laying the top soil to the ground need to be watered to the part that we are hope to laying the top soil. Then can fill the top soil to the ground between correct levels of the pegs with the help of threads as well. After the top soil is laying need to be watered again to that part. So I would like to explain about the final part of this project from the next article.
Thank you for reading . Good Bye and Stay Safe......
Learning and practicing the correct techniques is important.
Mmm yes akke
wow, our future engineer